Cikandang river discharge as a mini-hydropower plant
S Permana*; W M F Muin; G J Johari; A Susetyaningsih; Nanang

Department of Civil Engineering, Sekolah Tinggi Teknologi Garut, Jalan Mayor Syamsu 1, Garut 44151, Indonesia
sulwanpermana[at]sttgarut.ac.id


Abstract

Garut Regency is flanked by three mountains, namely Papandayan, Guntur, Cikuray. Some are coastal areas in the south of the Garut Regency. Cikandang River has the potential to meet the needs of mini-hydropower plants. The utilization of the Cikandang river is used as a mini-hydropower plant with a power of 1 MW to 10 MW. The locations of the Cikandang 1 and Cikandang 2 mini-hydropower plants nearby use the same potential discharge from the Cikandang river. In practice, the use of this river has a difference between PLTM Cikandang 1 of 6 MW and Cikandang 2 of 3 MW. The method is based on a pre-planned design layout. The calculated discharge is the mainstay discharge or the availability discharge calculated based on the FJ Mock method with a probability of 85% with ten years of rain data. Dependable flow on the Cikandang river is 12.88 m3 / sec, and the head is 32.7 m with head losses 0.86 m, and system efficiency is 0.69. The output power of the Cikandang 2 mini-hydropower plant is 2.88 MW. The difference between the Cikandang 1 and 2 mini-hydropower plants lies in the height of the head.

Keywords: cikandang river; dependable flow; head; mini-hydropower

Topic: Civil Engineering

Plain Format | Corresponding Author (Sulwan Permana)

Share Link

Share your abstract link to your social media or profile page

AASEC 2020 - Conference Management System

Powered By Konfrenzi Ultimate 1.832L-Build5 © 2007-2025 All Rights Reserved