AASEC 2020
Conference Management System
Main Site
Submission Guide
Register
Login
User List | Statistics
Abstract List | Statistics
Access Mode
:: Abstract ::

<< back

Optimization of Production Process Precast Concrete Product Box Girder (Case Study at PT Wika Beton)
Verly Widiantoro, Leni Sagita Riantini, And M. Ichsan Damiat

Department of Civil Engineering, Faculty of Engineering, Universitas Indonesia


Abstract

Infrastructure is one important element in a countrys development. The number of bridge infrastructure projects that can increase the growth of the construction industry in Indonesia must be supported by construction technology as well as the use of precast concrete. In its development, Wika Beton seeks to optimize the production process of precast products produced to prevent delays in production so that it can serve the needs of construction projects completed on time even when accelerating construction time is needed. One of the precast products produced by Wika Beton is a box-shaped bridge girder called Box Girder. The purpose of this study is to identify, analyze the current production of precast concrete box girder products, make the production process of precast concrete box girder products effective and efficient and optimize the production process of precast concrete box girder products to improve time performance.

Keywords: Optimization; Production; Box Girder; Precast

Topic: Civil Engineering

Plain Format | Corresponding Author (Verly Widiantoro)

Share Link

Share your abstract link to your social media or profile page

AASEC 2020 - Conference Management System

Powered By Konfrenzi Ultimate 1.832L-Build5 © 2007-2026 All Rights Reserved