MODELING THE POTENTIAL OF DEMAND FOR DESIGN CIKEMBAR AIRPORT TERMINAL CAPACITY, SUKABUMI, JAWA BARAT, INDONESIA
Agung Setiawan, Juang Akbardin, Asep Yudi Permana

Arsitektur S-2 FPTK Universitas Pendidikan Indonesia


Abstract

West Java Province is challenged by a very unique and strategic geographic field as a province with the largest population in Indonesia and as a province that is at the forefront of supporting the dynamics of rapid development in the capital, DKI Jakarta. In realizing equitable development, as stated in the West Java Provincial Medium-Term Development Plan (RPJMD) 2018-2023, infrastructure development is regulated in a priority scheme that aims to bring equitable development. One of the planned transportation infrastructure developments in the construction of Cikembar Airport, Sukabumi, is prepared to serve the development area (WP) of the Sukabumi area and its surroundings which is targeted for completion in 2023. In preparing the airport design, a projection analysis based on demand is needed first. which correlates with statistical data. Forecasting analysis (forecasting) the number of passengers at Cikembar Airport aims to obtain potential passenger demand and a description of the needs for terminal facilities through the collection of statistical data to be analyzed using the correlation method and the multiple linear regression method between the number of passengers as the dependent variable. Meanwhile, statistical variables such as population growth, tourist growth, and Gross Regional Domestic Product (GRDP), Sukabumi, and West Java Regencies were determined as independent variables. In formulating the terminal room facilities, it refers to the standards issued by the Directorate General of Civil Aviation through SKEP No.77 / VI Year 2005. Considering the moderate upward trend approach, the estimated number of passengers at Cikembar Airport passenger terminal in 2023, namely the year the airport is planned to be realized, is as much as 756,029 passengers with busy time passengers totaling 605 passengers. The operational area needed for the terminal in that year was 8,468 m2. Assuming the concession area provided is 30%, the total terminal area required i

Keywords: Analysis of Potential Demand, Space Requirements, Airport Terminals, tourist growth

Topic: Mathematics

ICMScE 2021 Conference | Conference Management System